Motivated Superintendent known for successfully handling issues with swiftness. 30+ years of experience with new and remodeled commercial, residential, multifamily, retail and healthcare construction. Skilled leader, overseeing the work of subcontractors, coordinating supplies, and inspections.
Overview
38
38
years of professional experience
3
3
Certification
Work History
Foreman
Shields Inc
08.2023 - Current
Maintained a safe working environment through adherence to safety protocols and regular site inspections.
Ensured timely completion of projects with effective time management and prioritization of tasks.
Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
Inspected work performed by carpentry crews to check completion of job specifications.
Completed projects on-time and within budget through effective resource allocation and scheduling.
Assessed project size to prepare work orders and determine resources needed to complete jobs.
Robert Rock
Self Employed Residential / Commercial Contractor
06.2020 - 07.2023
Specializing in additions and remodeling
Interior and exterior wood, metal framing, sheeting and drywall hanging and finishing.
Plumbing, toilets, bathtubs, sinks and fixtures
Concrete slabs, sidewalks and footers.
Decks, porches and sunrooms.
Windows, doors and hardware.
Cabinets, countertops, baseboards and trim.
Lvt, vct flooring.
HVAC relocating.
Minor electric (switches, outlets, ceiling fans and fixtures.
Mig and stick welding.
Shingle and tin roofing.
Assistant Superintendent/Superintendent
ANF Group, Inc.
06.2016 - 05.2020
Experienced in safety toolbox talks and orientations.
Experienced in ICRA setup and monitoring.
Experience in AHCA inspections and knowledgeable of ADA requirements.
Experienced managing projects for health care, senior living facilities and multi-family complexes.
Experience with med gas, nurse call, patient headwalls, elevators, fire protection, Card readers, HVAC, inline and open plenum fire dampers, MRI, CAT Scan, lead walls.
Collaborated with cross-functional teams including general superintendents, project managers, subcontractors and clients to resolve issues and implement corrective actions.
Participate in pre-project planning sessions to familiarize with project requirements and offer practical advice pertaining to various project schedules.
Worked closely with team members to deliver project requirements, develop solutions and meet deadlines.
Planned three week look-ahead schedules to organize and prioritize work assignments, subcontractors, laborers, vendors and inspections.
Responsible for accurately producing and distributing RFI's, Daily Reports.
Routine project site review problems, progress against schedule, subcontractor's performance, compliance with plans and specifications and quality of work being performed.
Foreman
Lotspeich Co. of FL, Inc.
08.2007 - 06.2016
Commercial, residential, retail and healthcare experience.
Layout, interior and exterior framer.
Drywall hanger/finisher.
Basic and specialty acoustical ceiling installation.
Windows, doors, frames and hardware installation.
Cabinet and countertop installation.
Division 10 accessories installation.
LVT flooring and trim installation.
Sound panel installation.
Wall protection, crash rail and corner guard installation
Fire and sound caulking
Coordinated with other subcontractors to assure no schedule or installation conflicts.
Supervised projects to uphold schedule requirements and quality demands.
Responsible for figuring and ordering materials required to complete project.
Foreman
Clemmons Drywall Inc.
01.2005 - 07.2007
Interior and exterior framer, hanger, finisher.
Basic and custom acoustical ceilings.
Hollow metal, knock down and prehung doors, frames and windows.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
Checked equipment to determine if maintenance was required.
Interacted with employees to demonstrate high standards and mitigate issues effectively.
Monitored usage of supplies and materials to establish cost effective operations.
Evaluated incoming materials for quality and amounts ordered.
Reworked positions and workflow based on individual abilities and production targets.
Inspected equipment and tools used for safe operation.
Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
Foreman
J.D. Clark Co.
02.2001 - 01.2005
Interior and exterior layout, framer, drywall hanger, finisher.
Basic and custom acoustical ceilings.
Hollow metal and knock down door and window frames.
Fire coating and caulking.
Punchout for turn over projects.
Used hand and power tools, equipment, and instruments accurately.
Oversaw maintenance and repair of shop equipment
Managed materials inside shop and at job locations.
Troubleshot equipment to reduce service calls and downtime.
Oversaw inventory and product stock to develop and maintain inventory controls resulting in cost savings and reduced overages.
Skills
Report Generation
Blueprint interpretation
Project coordination
Attention to detail
Quality assurance
Policy implementation
Site maintenance and management
Relationship building
Site safety management
Certification
Procore Superintendent
Procore Student
OSHA 30
Hilti
Accomplishments
Passed AHCA inspection on my first project as a superintendent with ANF Group.
Passed my first AHCA inspection as a division 10 installer without comments with Lotspeich.
Lotspeich 2x Key club nominee for performance.
Supervised 90 subcontractor employees
15+ years without safety violations or injuries.
Cost savings with hands-on punchlist completion as a superintendent.