Detail-oriented carpenter with expertise in constructing high-quality frameworks, ensuring worksite safety, and collaborating effectively with teams to meet project deadlines.
Overview
3
3
years of professional experience
Work History
Carpenter
Rick Maples CO
Maynardville, TN
05.2025 - 06.2026
Constructed custom frameworks and structures using precise measurements and quality materials.
Operated various carpentry tools and equipment, ensuring compliance with safety standards.
Collaborated with team members to complete projects within deadlines while maintaining high-quality standards.
Inspected completed work for accuracy, addressing any discrepancies to ensure customer satisfaction.
Completed installations of building structures, trim, flooring, and cabinetry.
Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
Demonstrated close attention to detail to verify quality and accuracy of work.
Measured materials to determine size and quantity required for the construction project.
Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.
Repaired damaged doors, windows and other structures.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Measured, cut and installed drywall, paneling and other materials.
Cut and shaped materials to meet outlined measurements.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Built boat decks and boat houses.
Remodeled houses.
Laborer
T&M Decking
Oxford, NC
03.2023 - 04.2025
Collaborated with team members to execute decking projects efficiently and effectively.
Operated hand and power tools for decking installations and repairs.
Assisted in project layout, ensuring compliance with specifications and safety protocols.
Maintained a clean work environment, adhering to safety regulations at all times.
Was responsible for maintenance of vehicles and equipment.
Assisted with welding projects and equipment.
Loaded, unloaded, and moved material to and from storage and production areas.
Contributed to successful completion of projects by following instructions from supervisors and adapting to changing priorities.
Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
Followed instructions and safety protocols to prevent accidents and injuries.
Cleaned and maintained tools, equipment and worksites.
Moved and cleared debris from work sites to dispose of in designated areas.
Assisted in digging, trenching and backfilling trenches and foundations.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Mixed and poured concrete for a variety of projects.
Operated forklifts and boom lifts to complete various tasks.