Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Arron Schumacher

Winston-Salem,NC

Summary

Results-driven Level 2 Maintenance Technician with expertise in preventive maintenance and mechanical troubleshooting at Hanes Geo Components. Proven ability to enhance operational efficiency through effective PLC programming and collaborative teamwork. Skilled in electrical controls and welding, ensuring high-quality service delivery while maintaining safety standards. Ready to leverage expertise as an Industrial Maintenance Technician to contribute to and grow with a dynamic team

Overview

6
6
years of professional experience
1
1
Certification

Work History

Level 2 Maintenance Technician

Hanes Geo Components
03.2023 - Current
  • Conducted routine inspections and preventive maintenance on equipment to ensure operational efficiency.
  • Diagnosed mechanical issues and performed repairs to minimize downtime and enhance productivity.
  • Collaborated with team members to streamline maintenance workflows, improving overall service delivery.
  • Utilized diagnostic tools and technology for troubleshooting various systems and components effectively.
  • Electrical controls troubleshooting and designing (relays, contactor's, prox sensors, transformers, PLC, HMI, motors etc)
  • Drive programming and installation
  • Motor replacement and repair
  • PLC troubleshooting and basics of programming (Allen Bradley and Automation Direct)
  • Threading and running pipe
  • Pneumatics
  • A little knowledge on hydraulics
  • Welding
  • Lock out tag out

Pipeline Laborer

Energy Services South
09.2022 - 02.2023
  • Operated heavy machinery to assist in pipeline construction and maintenance tasks.
  • Conducted routine inspections to ensure compliance with safety standards and regulations.
  • Collaborated with team members to complete projects on schedule while maintaining quality control.
  • Assisted in trench digging and backfilling activities for pipeline installation projects.
  • Helped get the pipes arranged and aligned to lay joints
  • Coated pipe
  • Tracked pipe in the ground

Pipe Layer

AJ John's Inc
07.2020 - 07.2022
  • Operated heavy machinery to install and maintain pipelines efficiently.
  • Collaborated with team members to ensure precise alignment of piping systems.
  • Conducted site inspections to assess soil conditions and prepare for installations.
  • Sealed joints between sections of pipe using cement, mortar, or plastic sealants
  • Used hand tools such as saws, drills, hammers,and wrenches for various tasks
  • Inspected existing pipeline systems to identify problems with corroded or damaged pipes
  • Operated a front end loader
  • Cut and measured joints of sewer and water pipe
  • Cut, prepared and laid joints for storm drains
  • Measured, aligned and laid pipe of all kinds
  • Set up silt fence
  • Digging

Skills

  • Preventive Maintenance
  • Building maintenance
  • Mechanical troubleshooting
  • Troubleshooting skills
  • PLC programming (Allen Bradley Automation Direct)
  • Electrical controls installation and troubleshooting
  • Drives programming and installation
  • HMI designing and programming
  • Industrial mechanical skills
  • Industrial pneumatics
  • Industrial motor replacement and troubleshooting
  • Welding

Certification

  • Electrical Maintenance & troubleshooting
  • The Confident PLC Programmer method
  • The Confident HMI Designer method
  • The Drives Course

Timeline

Level 2 Maintenance Technician

Hanes Geo Components
03.2023 - Current

Pipeline Laborer

Energy Services South
09.2022 - 02.2023

Pipe Layer

AJ John's Inc
07.2020 - 07.2022
Arron Schumacher